Electricity supply from Adani center to Bangladesh is completely stopped
India’s Adani Group’s coal-fired power plants have been completely shut down. An average of about 1500 megawatts of electricity was available from the two units of the centre. The first unit of the center was already shut down for routine maintenance. Meanwhile, power generation from the second unit also stopped last Friday due to a […]
Read More
